Renovation contractor ยท Tanner Yard
Kitchen and bathroom renovation
We do the hacking, plumbing, wiring and carpentry ourselves. You get one fixed quote after a free site visit.
Book a site visitWhat would happen next
We email you within a day to confirm the time.
Faizal Rahman, our site manager, comes to measure the room. The visit takes about an hour and is free.
Your fixed quote follows within three working days of the visit.
This is a demo site, so nothing was sent.
- Kitchens from
- S$14,800, cabinets included
- Site visits
- Monday to Saturday
- Workshop
- 12 Tanner Yard
The kitchen below is in Marine Vale and took 19 working days.
Kitchens
A kitchen takes 15 to 19 working days. The price starts from S$14,800 for up to 4 metres of cabinets.
- Week 1
Hacking and pipes
We remove the old cabinets and tiles and take the debris away. Our plumber runs the new water pipes and drains.
- Week 2
Wiring and tiles
Our electrician adds the sockets and the cooker point. The floor and wall tiles are laid and left to set for two days.
- Week 3
Cabinets and worktop
The cabinets are built in our workshop and fitted in two days. The worktop, sink and hob go in last.
- In the price
- Hacking and disposal, pipes and drains, wiring and sockets, floor and wall tiles, cabinets, a quartz worktop, a sink and a tap.
- Not in the price
- The hob, hood, oven and fridge. We fit the ones you buy and do not charge for it.
Bathrooms
A bathroom takes 10 working days and starts from S$6,900.
- Waterproofing
- We lay a membrane on the floor and 30 cm up the walls. The floor is then filled with water for 48 hours as a leak test.
- Tiles and fittings
- The price includes floor and wall tiles, a basin, a toilet, a shower set and a mirror cabinet from our range.
- Flats with two bathrooms
- We do one at a time, and the other stays in use.
- Flats with one bathroom
- The toilet is out of use for about six days. We tell you which days at the site visit.
- Not in the price
- Bathtubs, rain showers and moving the toilet to a new spot.
Whole flats
We renovate 3-room, 4-room and 5-room flats. Each price covers the kitchen, the bathrooms, floors, wiring and paint.
| Flat | What is done | Time | Starts from |
|---|---|---|---|
| 3-room flat | Kitchen, one bathroom, floors, wiring and paint | 6 weeks | S$38,000 |
| 4-room flat | Kitchen, two bathrooms, floors, wiring and paint | 8 weeks | S$46,000 |
| 5-room flat | Kitchen, two bathrooms, floors, wiring, paint and three built-in wardrobes | 9 weeks | S$55,000 |
We apply for the renovation permits and book the lift padding with your building's office. We do not take on landed houses or shops.
Finished work
The kitchen at the top of this page is in Marine Vale. These two jobs were handed over this year.
3-room flat in Orchid Rise
- Work
- New kitchen, one bathroom, wood-look floors, full rewiring and paint
- Time
- 6 weeks
- Cost
- S$41,300
Bathroom in Linden Park
- Work
- Terrazzo tiles, a basin cabinet and a mirror cabinet built in our workshop
- Time
- 10 working days
- Cost
- S$8,900
How a job runs
Free site visit
Faizal Rahman, our site manager, measures the rooms and checks the pipes and wiring. It takes about an hour.
One fixed quote
Lim Hui Min, our estimator, sends it within three working days. The total changes only if you change the work.
A start date in writing
You pay 20% to book the date, 40% when the tiling is done and 40% after handover.
Photographs every working day
Work runs from 9am to 5pm, Monday to Saturday. Faizal sends photographs when the crew leaves.
Handover
We walk through every room with you and fix what you point out. We come back for any fault in our work for 12 months.
- Workshop
- 12 Tanner Yard, Singapore
- Hours
- Monday to Saturday, 9am to 6pm. Closed on Sundays and public holidays.
- Parking
- Two visitor spaces by the gate.
- Message us on WhatsApp